Projects
Metal Structures and Piping
Fabrication, and assembly of metal structures and piping systems adapted to different industrial sectors and requirements.
General Facilities
Premises
Plate Work Unit
Machining Unit
Loading and Unloading Area
Our 6,000 m2 premises includes a platework and welding unit (1,500 m2), a machining unit (900 m2), and a loading and unloading area (1,500 m2).
We have a 10-tonne overhead crane with a 10-m hook height for loading and unloading operations.

